Project Pipeline

Project Locality FY21 - FY24 FY25 - FY29 FY30 - FY33 After FY33
Ablett Pavilion Upgrade Stage 2 Myrtleford
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
Accessibility Improvements Multiple Localities
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
Alpine Better Places Barnard Street Bright
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Alpine Better Places Gavan Street Bright
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Alpine Better Places Harrietville Feathertop Track Car Park Upgrade Harrietville
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
Alpine Better Places Harrietville Hall Plaza Upgrade Harrietville
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Alpine Better Places Harrietville Pioneer and Tavare Park Upgrade Harrietville
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
Alpine Better Places Tawonga South Concept Design Tawonga South
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Alpine Events Park Footpath Links Bright
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Alpine Riding Club And Pony Club Upgrade Projects Bright
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Alternative Irrigation Water Supply For Howitt And Centenary Parks Bright
2029/30 to 2032/33
2029/30 to 2032/33
2029/30 to 2032/33
2029/30 to 2032/33
Anderson Street Upgrade Bright
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Ashwood Avenue - Spray Seal Footpath Bright
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Back Porepunkah Road Shoulder Widening Porepunkah
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Back Porepunkah Road To Roberts Creek - Asphalt Footpath Porepunkah
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Bakers Gully Creek Link From Burke Street To Ovens River - Asphalt Footpath Bright
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Bakers Gully Reservoir Walk From Somers Park To Reservoir - Gravel Footpath Bright
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Bakers Gully Road - School Crossing Upgrade Bright
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
Bakers Gully Road From End Of Kerb And Channel To White Star Rise Estate - Spray Seal Footpath Bright
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Bakers Gully Road From McFadyens Lane To End Of Kerb And Channel - Spray Seal Footpath Bright
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Bakers Gully Road From Senior Citizens Car Park To Courthouse Theatre - New Concrete Footpath Bright
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Bakers Gully Road From Sommers Avenue To McFadyens Lane - Asphalt Footpath Bright
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Barnard Street To Anderson Street Laneway Development Bright
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Baroni Lane Sealing Porepunkah
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Barwidgee Creek Reserve Multiple/Other
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Barwidgee Creek to Great Alpine Road Crossing Near Butter Factory - Asphalt Footpath Myrtleford
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Bicycle Racks Bright
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
Big Hill Mountain Bike Park Amenities Upgrade Mount Beauty
2029/30 to 2032/33
2029/30 to 2032/33
2029/30 to 2032/33
2029/30 to 2032/33
Boardwalk Along Happy Valley Creek Myrtleford
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Bogong High Plains Road Bank Stabilisation Mount Beauty
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
Bogong High Plains Road Complete Renewal Multiple/Other
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Bogong High Plains Road From Big Hill To Survey Track Link - Gravel Footpath Multiple/Other
2029/30 to 2032/33
2029/30 to 2032/33
2029/30 to 2032/33
2029/30 to 2032/33
Bogong Village Entrance Improvements Multiple/Other
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Bon Accord Track New Footpath From Great Alpine Road Harrietville
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Bright and Porepunkah Town Entry Signage Multiple/Other
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Bright Botanic Gardens Bright
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Bright Community Centre Parking Upgrade Bright
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
Bright Electric Hop on Hop off Bus Bright
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Bright Fishway Bright
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Bright Lake and Deciduous Tree Park Bright
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Bright Library Renewal Bright
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Bright Outdoor Pool Bright
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Bright River Pool Precinct Upgrade (Diving Board, Boardwalk And Slide) Bright
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Bright Skate Park Upgrade Bright
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Bright Visitor Information Center Access Improvements Bright
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
Bright Whitewater Park Bright
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Burke Street Toilet Renewal Bright
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Burke Street/Bakers Gully Upgrade Bright
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Bus Bay Relocation Bright
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
Camp Street Angle Parking Bright
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Camp Street Contra-flow Lane Bright
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Camping Park Road To Great Alpine Road - New Footpath Harrietville
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Centenary Park Extension Bright
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Centenary Park Shelter Upgrade Bright
2029/30 to 2032/33
2029/30 to 2032/33
2029/30 to 2032/33
2029/30 to 2032/33
Charlie Miley Walking Track Upgrade Harrietville
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Cherry Walk Extension From Centenary Park To Hawthorn Lane - Gravel Footpath Bright
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Cherry Walk From Jenveys Hole To Upper Swingbridge - Gravel Footpath Bright
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Cherry Walk Upgrade To Wheelchair Accessible Bright
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Churchill Avenue From Caravan Park Entrance To Alrima Court - Concrete Footpath Bright
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Clarrie Keating Park Amenities Renewal Harrietville
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Closed-Circuit Television At Transfer Stations Multiple Localities
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Clyde Street Disabled Bay Myrtleford
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Cobden Street Drainage Upgade Bright
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Conifer Street From Eliza Way Through Old Mill Site To Mummery Road - Concrete Footpath Myrtleford
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Conifer Street From O'Donnell Avenue To Eliza Way - Concrete Footpath Myrtleford
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Courthouse Precinct Senior Citizens Centre - Elevated Walkway Bright
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Cycle Safety Signage And Line Marking Multiple Localities
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Deciduous Tree Park Bright
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Dederang Recreation Reserve Change Facilities Dederang
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
Dederang Recreation Reserve Masterplan Dederang
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
Delaney Avenue Drainage Bright
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Delany Avenue From Mountbatten Avenue To Racecourse Road - Spray Seal Footpath Bright
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Duke Street From Doctor's Surgery To Prince Street - Concrete Footpath Myrtleford
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Falls To Mount Beauty Epic Mountain Bike Trail Mount Beauty
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Featherop Track Footpath from Dredgehole Carpark to Bungalow Spur Trailhead Harrietville
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
Flagpoles At Town Entrance On Great Alpine Road Myrtleford
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Gapsted Hall Improvements Stage 2 Multiple/Other
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Generator Installation At Relief Centres Multiple Localities
2029/30 to 2032/33
2029/30 to 2032/33
2029/30 to 2032/33
2029/30 to 2032/33
Geoffrey Street New Footpath Myrtleford
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Germantown Bridge Upgrade Multiple/Other
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Golden Picture Frames Multiple Localities
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Great Alpine Road New Roundabout At Ashwood Avenue Bright
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Great Alpine Road Underpass At Rail Trail Crossing Bright
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Happy Valley Creek Crossing On Standish Street Myrtleford
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Happy Valley Creek Renewal Myrtleford
2029/30 to 2032/33
2029/30 to 2032/33
2029/30 to 2032/33
2029/30 to 2032/33
Harrietville Hall Plaza Harrietville
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Harrietville Levees Harrietville
2029/30 to 2032/33
2029/30 to 2032/33
2029/30 to 2032/33
2029/30 to 2032/33
Harrietville Tailings Land Subdivision Harrietville
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Harrietville Wastewater Scheme Implementation Harrietville
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Harts Lane To Nimmo Bridge - Gravel Footpath Myrtleford
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Hawthorn Lane From Cobden Street To Coronation Avenue - Asphalt Footpath Bright
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Hawthorn Lane From Coronation Avenue To Existing End Of Concrete Path - Asphalt Footpath Bright
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Hawthorn Lane From Delany Avenue To Mountbatten Avenue - Concrete Footpath Bright
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Hollonds Street Traffic Reversal Mount Beauty
2029/30 to 2032/33
2029/30 to 2032/33
2029/30 to 2032/33
2029/30 to 2032/33
Hotham To Harrietville Epic Mountain Bike Trail Harrietville
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Howard's Bridge Artwork Harrietville
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Howards Bridge To Frosty Corner - Gravel Footpath Harrietville
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Howitt Lane Upgrade Bright
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Howitt Park Renewal Bright
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Ice Skating Rink Dinner Plain
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Kiewa Crescent From Lakeside Avenue to Past Beauty Avenue - Concrete Footpath Mount Beauty
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Kiewa River East Track From Damms Road To Rockpool Road - Gravel Footpath Mount Beauty
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Kiewa River From Pebble Beach To Fishermans Track - Gravel Footpath Tawonga
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Kiewa River Trail Extension - Confluence To Damms Road Mount Beauty
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
Lakeside Avenue From Mount Street To Primary School Car Park - Spray Seal Footpath Mount Beauty
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
Les Peart/Pool Road Triangle - Sealed Overflow Car Park Mount Beauty
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Les Peart/Pool Road Triangle - Unsealed Overflow Car Park Mount Beauty
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Lewis Avenue To Jubilee Park Along Happy Valley Creek - Asphalt Footpath Myrtleford
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Line Marking Additional Car Parking Bays Bright
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
Lookout Upgrades Multiple Localities
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Mackay Street From Nelse Street To Valley Avenue - Concrete Footpath Mount Beauty
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Mafeking Square Webcam Bright
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Manning Park Upgrade Bright
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Martley Street New Footpath Porepunkah
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
Masciorini Lane Upgrade Bright
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
McNamara Reserve Scoreboard Myrtleford
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Memorial Park Cricket Change Room Upgrade Myrtleford
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Memorial Park Duke Street Interface Upgrade Myrtleford
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
Montgomery Lane Upgrade Buckland
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
Morses Creek Road 1.7km Extension Of Seal Wandiligong
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Morses Creek Road From School Lane To Growlers Creek Road - Asphalt Footpath Wandiligong
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Morses Creek Road Pavement Renewal Bright
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
Mount Beauty Aerodrome Runway Extension Stage 2 Mount Beauty
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Mount Beauty All Weather Pool Mount Beauty
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Mount Beauty Beginner Mountain Bike Trails Mount Beauty
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Mount Beauty Big Hill Stage Mount Beauty
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Mount Beauty Dog Park Mount Beauty
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Mount Beauty Falls Creek Staff Car Park Mount Beauty
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Mount Beauty Footpath Network Expansion Stage 2 Mount Beauty
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Mount Beauty Landfill Monitoring Bores Mount Beauty
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
Mount Beauty Landfill Rehabilitation Mount Beauty
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Mount Beauty Pondage Boardwalk And Viewing Deck Mount Beauty
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Mount Beauty Pool Plant Replacement Mount Beauty
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
Mount Beauty Pool Renewal Mount Beauty
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Mount Beauty Recreation Reserve Multi-purpose Facility (Incorporating Tennis, Soccer And Other) Mount Beauty
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Mount Beauty Recreation Reserve Parking And Access Improvements Mount Beauty
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Mount Beauty Soccer Infrastructure (Seating, Shelter And Drinking Fountain) Mount Beauty
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Mount Beauty Splash Park Mount Beauty
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Mount Beauty Tail Race Bridge Widening Mount Beauty
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Mount Beauty Tennis Club Clubhouse Upgrade Mount Beauty
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Mount Buffalo Skywalk Multiple/Other
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Mount Porepunkah Road From Existing Paths In Norman Court To Mount Porepunkah Road - Concrete Footpath Bright
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Mountain View Children's Centre Parking Myrtleford
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Mountain View Children's Centre Upgrade Myrtleford
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
Mountbatten Avenue From The Art Gallery To Hawthorn Lane - Concrete Footpath Bright
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Mummery Road From Bird Avenue To Undara Road - Concrete Footpath Myrtleford
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Mummery Road From Botcher Lane To East Of Piazza Court - Spray Seal Footpath Myrtleford
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Mummery Road From End Of Existing Path To Proposed Subdivision Of Old Mill Site - Concrete Footpath Myrtleford
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Mummery Road From Undara Road To Tarrengower Court - Spray Seal Footpath Myrtleford
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Murray To Mountains Rail Trail Route Modification Myrtleford
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Myrtle Street Cycle Safety Upgrade Myrtleford
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Myrtle Street South Upgrade Myrtleford
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Myrtleford Bike Track Myrtleford
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Myrtleford Cemetery Access Road Upgrade Myrtleford
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
Myrtleford Courthouse Relocation Myrtleford
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Myrtleford Dog Park Myrtleford
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Myrtleford Golf Club Water Supply And Irrigation Upgrade Myrtleford
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Myrtleford Holiday Park Dump Point Upgrade Myrtleford
2029/30 to 2032/33
2029/30 to 2032/33
2029/30 to 2032/33
2029/30 to 2032/33
Myrtleford Landfill Rehabilitation Cell 1 Cap Construction Myrtleford
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
Myrtleford Loop Walk Improved Pedestrian Access Myrtleford
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Myrtleford Pool Renewal Myrtleford
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Myrtleford Splash Park Myrtleford
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Myrtleford to Gapsted - Reseal Shared Trail Myrtleford
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Myrtleford-Yackandandah Road From Dishers Avenue To Pinnigers Lane - Reseal Myrtleford
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Mystic Skyrail Bright
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Nelse Street From Lakeside Avenue To McKay Street - Concrete Footpath Mount Beauty
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
New Footpath Growlers Creek Road to Nightingales Wandiligong
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
New Footpath Hargreaves Road Bright Bright
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
New Kerb 35 Deacon Avenue Bright Bright
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
O'Donnell Avenue / Standish Street Kerb Realignment Myrtleford
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
O'Donnell Avenue From Conifer Street To Showgrounds - Asphalt Footpath Myrtleford
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
O'Donnell Avenue From Lawrence Street To Standish Street - Concrete Footpath Myrtleford
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
O'Donnell Avenue From Lennox Street To Conifer Street - Concrete Footpath Myrtleford
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Off Street Parking Upgrades Bright
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
Old Buckland Bridge New Footpath Porepunkah
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Old Harrietville Landfill Rehabilitation Harrietville
2029/30 to 2032/33
2029/30 to 2032/33
2029/30 to 2032/33
2029/30 to 2032/33
Old Mill Site Development Myrtleford
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Old Myrtleford Landfill Rehabilitation Myrtleford
2029/30 to 2032/33
2029/30 to 2032/33
2029/30 to 2032/33
2029/30 to 2032/33
One Mile Creek Road Sealing Porepunkah
2029/30 to 2032/33
2029/30 to 2032/33
2029/30 to 2032/33
2029/30 to 2032/33
Outdoor Fitness Stations Mount Beauty
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Ovens Road Bridge At Frasers Lane Bright
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Ovens Road Bridge At Hawthorn Lane Bright
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Park Street New Footpath Mount Beauty
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
ParksVic Discovery Centre Detailed Design And Implementation Mount Beauty
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Pebble Beach Loop - Concrete footpath Mount Beauty
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Pebble Beach Toilets Tawonga South
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Pebble Beach Walk Lighting Mount Beauty
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Pedestrian Crossings Bright
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
Pioneer Park Road Connection To Coronation Avenue Bright
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Playground Relocation From Lions Park Tawonga South
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Pondage Path East Side Shortcut Mount Beauty
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Porepunkah Children's Centre Porepunkah
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Porepunkah Fishway Porepunkah
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Porepunkah Jetty Renewal Porepunkah
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Porepunkah Ovens River Trail Porepunkah
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Porepunkah River Walk Extension From Pedestrian Bridge To Great Alpine Road - Gravel Footpath Porepunkah
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Porepunkah River Walk Extension From River Walk To Rail Trail - Gravel Footpath Porepunkah
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Porepunkah To Feathertop Winery - Reseal Shared Trail Porepunkah
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Prince Street From O'Donnell Avenue To Marion College - Concrete Footpath Myrtleford
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Prince Street From Smith Street To Myrtle Street - Concrete Footpath Myrtleford
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Public Dump Point Dederang
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Quins Gap Road Sealing Porepunkah
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
Rail Trail Enhancement Project Multiple Localities
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Rail Trail Lighting Bright
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Rail Trail Road Crossings - Safety Upgrades Multiple Localities
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
Rail Trail To Showgrounds - Gravel Footpath Myrtleford
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Rail Trail Widening - Bright To Porepunkah Multiple/Other
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Rail Trail Widening Bailey Street To Back Porepunkah Road Porepunkah
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Rail Trail Widening Bright to Porepunkah Bright
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Railway Avenue Angle Parking Bright
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
Railway Avenue To Ireland Street New Footpath Bright
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
Ranch Road - Spray Seal Tawonga South
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Recreation Reserve Pavilion Upgrade Mount Beauty
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Reform Hill Lookout Track From Higgins Court To New Lookout - Gravel Footpath Myrtleford
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Reform Hill Lower Track From Alice Street To Power Street Myrtleford
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Reid's Court To Allemar Court Reserve - Concrete Footpath Mount Beauty
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Relocation Bakers Gully Road Children's Crossing To Shared Trail Crossing Point Bright
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Relocation Of Gas Tank Dinner Plain
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Revised Village Entry Road And Roundabout Dinner Plain
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Riverside Avenue To Canyon Walk New Footpath Bright
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
Riverside Avenue Upgrade Bright
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
Riverside Park Movie Screen Porepunkah
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Riverside Park Renewal Porepunkah
2029/30 to 2032/33
2029/30 to 2032/33
2029/30 to 2032/33
2029/30 to 2032/33
Roberts Creek To Riverside Park - Asphalt Footpath Porepunkah
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Rotaract Park Upgrade Bright
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
Rotary Park Suspension Bridge Myrtleford
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Rotary Park Toilets Bright
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Savoy Club Car Park Extension Myrtleford
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Savoy Soccer Club Major Upgrade To Clubhouse Facilities Myrtleford
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Savoy Soccer Club Upgrade Myrtleford
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
Sealing Back Germantown Road Multiple/Other
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Sealing Feathertop Track Harrietville
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Sealing Fredas Lane Multiple/Other
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Senior Citizens Centre Playground Myrtleford
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Service Street Porepunkah Upgrade Porepunkah
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Shamrock Mine Walking Track Loop Harrietville
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Shared Trail Extension Buffalo Creek Road To Harts Lane Myrtleford
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Shared Trail Extension Through Wandiligong Diggings Wandiligong
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Shared Trail From Camp Street To Pioneer Park Bright
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Shared Trail Road Crossings Safety Improvements Multiple Localities
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Simmonds Creek Road And Kiewa Valley Highway Intersection - Pedestrian Safety Upgrade Mount Beauty
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
Simmonds Creek Road Footpath Extension To Annapurna Winery Tawonga South
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Single Trail Bike Track Harrietville
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Ski Slope Magic Carpet Dinner Plain
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Snowy Creek Road Drainage Upgrade Multiple/Other
2029/30 to 2032/33
2029/30 to 2032/33
2029/30 to 2032/33
2029/30 to 2032/33
Sound Shell Parking Upgrade Bright
2029/30 to 2032/33
2029/30 to 2032/33
2029/30 to 2032/33
2029/30 to 2032/33
St Bernard Drive From Wonnangatta Avenue To Kiewa Valley Highway - Concrete Footpath Tawonga South
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Stackey Gully Realignment Bright
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Stage 2 Footpath Along Kiewa Valley Highway Dederang
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Standish Street Footpath Myrtleford
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Star Road Reserve Upgrade Bright
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Station Street - Concrete Footpath South Side Porepunkah
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Survey Track Upgrade Mount Beauty
2029/30 to 2032/33
2029/30 to 2032/33
2029/30 to 2032/33
2029/30 to 2032/33
Tawonga Crescent Parking Mount Beauty
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
Tawonga Crescent Renewal Mount Beauty
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
Tawonga Memorial Park Tawonga
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Tawonga South Amenities Tawonga South
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Tennis Court Upgrade Dinner Plain
2029/30 to 2032/33
2029/30 to 2032/33
2029/30 to 2032/33
2029/30 to 2032/33
Toilet Facilities In Kiewa River Recreational Area Upstream From Ryder's Bridge Tawonga
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Town Centre Amenities Renewal Mount Beauty
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Town Centre Walkways Upgrade Bright
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Tracks and Trails Msterplan Multiple Localities
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
Trail Crossing Simmonds Creek Road - Kiewa Valley Highway Safety Upgrade Tawonga South
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Tronoh Dredge Hole Bank Stabilisation Harrietville
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Tronoh Reserve Walking Trails Upgrade Harrietville
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Vails Road Junction Creek Walk - Gravel Footpath Tawonga South
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Vails Road Widening Tawonga South
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Valley Avenue Footpath Mount Beauty
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Village Green Dinner Plain
After 2032/33
After 2032/33
After 2032/33
After 2032/33
Wandi Walk Realignment To Bypass Private Property - Gravel Footpath Wandiligong
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Wandi Walk To Bennetts Trail - Gravel Footpath Wandiligong
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
2021/22 to 2024/25
Wandi Walk Upgrade From Lions Park To Doherty's Bridge Wandiligong
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Wandiligong Heritage Trail Wandiligong
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Water Tower Development Dinner Plain
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Welcome Rotunda Upgrade Bright
2029/30 to 2032/33
2029/30 to 2032/33
2029/30 to 2032/33
2029/30 to 2032/33
Wonangatta Aveune Drainage Tawonga South
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Wonnangatta Avenue From Kiewa Valley Highway To St Bernard Drive - Concrete Footpath Tawonga South
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
2025/26 to 2028/29
Wood Street Upgrade Bright
After 2032/33
After 2032/33
After 2032/33
After 2032/33